Cargando…
Quality control procedures applied to test the performance of the CMS muon drift chambers built at CIEMAT
In this document the quality control procedures applied to test the performance of the CMS muon drift chambers built at CIEMAT are described. We include a description of the high voltage and front end electronics associated to the chambers. Every procedure is described in detail and the most common...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/787465 |
Sumario: | In this document the quality control procedures applied to test the performance of the CMS muon drift chambers built at CIEMAT are described. We include a description of the high voltage and front end electronics associated to the chambers. Every procedure is described in detail and the most common problems and possible solutions are discussed. This document can be considered as a chamber test handbook. |
---|