Cargando…

Development of a Beam Loss Detection System for the CLIC Test Facility 3

The CLIC test facility 3 (CTF3) provides a 3.5A, 1.6us electron beam pulse of 150MeV at the end of the linac. The average beam power is 4 kW. Beam losses will be monitored all along the linac in order to keep the radiation level as low as possible. The heavy beam loading of the linac can lead to tim...

Descripción completa

Detalles Bibliográficos
Autores principales: Lefèvre, T, Velasco, M, Wood, M, Braun, Hans Heinrich, Corsini, R, Gasior, M, Tecker, F A
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.1831142
http://cds.cern.ch/record/787761

Ejemplares similares