R and D for the Feasibility Study of CLIC Technology
An overview is given of the necessary R&D and particularly of the CLIC test facility CTF3 which is presently under construction for demonstrating the key issues related to the CLIC technology and to the two-beam scheme. The results concerning the commissioning of the injector and of the first pa...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/788524 |
Sumario: | An overview is given of the necessary R&D and particularly of the CLIC test facility CTF3 which is presently under construction for demonstrating the key issues related to the CLIC technology and to the two-beam scheme. The results concerning the commissioning of the injector and of the first part of the linac already built are summarized. The main R&D topics to be covered with this test infrastructure are described and the planned road-map in order to reach the pre-defined goals is indicated. The potential of CTF3 for checking the bunch-train recombination, testing RF accelerating structures, investigating the use of a drive-beam for RF power production, for bench-marking simulation codes and possibly making low-energy experiments related to linear collider R&D is presented. The activities required for the feasibility programme planned are given in the form of work packages, together with the needed but not available resources and the time schedule. |
---|