Cargando…
R and D for the Feasibility Study of CLIC Technology
An overview is given of the necessary R&D and particularly of the CLIC test facility CTF3 which is presently under construction for demonstrating the key issues related to the CLIC technology and to the two-beam scheme. The results concerning the commissioning of the injector and of the first pa...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/788524 |
_version_ | 1780904461848281088 |
---|---|
author | Braun, H Delahaye, J P Geschonke, Günther Guignard, Gilbert Hübner, K Wilson, Ian H |
author_facet | Braun, H Delahaye, J P Geschonke, Günther Guignard, Gilbert Hübner, K Wilson, Ian H |
author_sort | Braun, H |
collection | CERN |
description | An overview is given of the necessary R&D and particularly of the CLIC test facility CTF3 which is presently under construction for demonstrating the key issues related to the CLIC technology and to the two-beam scheme. The results concerning the commissioning of the injector and of the first part of the linac already built are summarized. The main R&D topics to be covered with this test infrastructure are described and the planned road-map in order to reach the pre-defined goals is indicated. The potential of CTF3 for checking the bunch-train recombination, testing RF accelerating structures, investigating the use of a drive-beam for RF power production, for bench-marking simulation codes and possibly making low-energy experiments related to linear collider R&D is presented. The activities required for the feasibility programme planned are given in the form of work packages, together with the needed but not available resources and the time schedule. |
id | cern-788524 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2004 |
record_format | invenio |
spelling | cern-7885242023-07-20T15:00:44Zhttp://cds.cern.ch/record/788524engBraun, HDelahaye, J PGeschonke, GüntherGuignard, GilbertHübner, KWilson, Ian HR and D for the Feasibility Study of CLIC TechnologyAccelerators and Storage RingsAn overview is given of the necessary R&D and particularly of the CLIC test facility CTF3 which is presently under construction for demonstrating the key issues related to the CLIC technology and to the two-beam scheme. The results concerning the commissioning of the injector and of the first part of the linac already built are summarized. The main R&D topics to be covered with this test infrastructure are described and the planned road-map in order to reach the pre-defined goals is indicated. The potential of CTF3 for checking the bunch-train recombination, testing RF accelerating structures, investigating the use of a drive-beam for RF power production, for bench-marking simulation codes and possibly making low-energy experiments related to linear collider R&D is presented. The activities required for the feasibility programme planned are given in the form of work packages, together with the needed but not available resources and the time schedule.CERN-OPEN-2004-020CLIC-Note-596CARE-Note-2004-006-ELANCARE-ELAN-Document-2004-006oai:cds.cern.ch:7885242004-08-12 |
spellingShingle | Accelerators and Storage Rings Braun, H Delahaye, J P Geschonke, Günther Guignard, Gilbert Hübner, K Wilson, Ian H R and D for the Feasibility Study of CLIC Technology |
title | R and D for the Feasibility Study of CLIC Technology |
title_full | R and D for the Feasibility Study of CLIC Technology |
title_fullStr | R and D for the Feasibility Study of CLIC Technology |
title_full_unstemmed | R and D for the Feasibility Study of CLIC Technology |
title_short | R and D for the Feasibility Study of CLIC Technology |
title_sort | r and d for the feasibility study of clic technology |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/788524 |
work_keys_str_mv | AT braunh randdforthefeasibilitystudyofclictechnology AT delahayejp randdforthefeasibilitystudyofclictechnology AT geschonkegunther randdforthefeasibilitystudyofclictechnology AT guignardgilbert randdforthefeasibilitystudyofclictechnology AT hubnerk randdforthefeasibilitystudyofclictechnology AT wilsonianh randdforthefeasibilitystudyofclictechnology |