Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8

Beam transfer from the CERN Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC) will be done through the two transfer lines TI 2 and TI 8, presently under construction, with a combined length of about 5.6 km. The final layout, optics design and correction scheme for these lines will be...

Descripción completa

Detalles Bibliográficos
Autores principales: Goddard, B, Mertens, V, Risselada, Thys
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/789329
_version_ 1780904502906322944
author Goddard, B
Mertens, V
Risselada, Thys
author_facet Goddard, B
Mertens, V
Risselada, Thys
author_sort Goddard, B
collection CERN
description Beam transfer from the CERN Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC) will be done through the two transfer lines TI 2 and TI 8, presently under construction, with a combined length of about 5.6 km. The final layout, optics design and correction scheme for these lines will be presented. The requirement of simultaneously matching their geometry and optics with that of the LHC will be treated, including the methodology for alignment of the elements along the line and a proposed solution in the final matching section. After the commissioning of the short transfer line TT40 just upstream of TI 8 in 2003, beam tests of the whole of TI 8 are scheduled for autumn 2004, with the aim to validate many of the new features and mechanisms involved in the future control and operation of these lines. The status of the installation will be described, comprising the progress with infrastructure, services and line elements. An outlook will be given for the work remaining until 2007.
id cern-789329
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2004
record_format invenio
spelling cern-7893292023-05-31T13:22:40Zhttp://cds.cern.ch/record/789329engGoddard, BMertens, VRisselada, ThysStatus and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8Accelerators and Storage RingsBeam transfer from the CERN Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC) will be done through the two transfer lines TI 2 and TI 8, presently under construction, with a combined length of about 5.6 km. The final layout, optics design and correction scheme for these lines will be presented. The requirement of simultaneously matching their geometry and optics with that of the LHC will be treated, including the methodology for alignment of the elements along the line and a proposed solution in the final matching section. After the commissioning of the short transfer line TT40 just upstream of TI 8 in 2003, beam tests of the whole of TI 8 are scheduled for autumn 2004, with the aim to validate many of the new features and mechanisms involved in the future control and operation of these lines. The status of the installation will be described, comprising the progress with infrastructure, services and line elements. An outlook will be given for the work remaining until 2007.LHC-Project-Report-751CERN-LHC-Project-Report-751oai:cds.cern.ch:7893292004
spellingShingle Accelerators and Storage Rings
Goddard, B
Mertens, V
Risselada, Thys
Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
title Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
title_full Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
title_fullStr Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
title_full_unstemmed Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
title_short Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
title_sort status and plans for the sps to lhc beam transfer lines ti 2 and ti 8
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/789329
work_keys_str_mv AT goddardb statusandplansforthespstolhcbeamtransferlinesti2andti8
AT mertensv statusandplansforthespstolhcbeamtransferlinesti2andti8
AT risseladathys statusandplansforthespstolhcbeamtransferlinesti2andti8