Cargando…

Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8

Beam transfer from the CERN Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC) will be done through the two transfer lines TI 2 and TI 8, presently under construction, with a combined length of about 5.6 km. The final layout, optics design and correction scheme for these lines will be...

Descripción completa

Detalles Bibliográficos
Autores principales: Goddard, B, Mertens, V, Risselada, Thys
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/789329