Cargando…
Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
Beam transfer from the CERN Super Proton Synchrotron (SPS) to the Large Hadron Collider (LHC) will be done through the two transfer lines TI 2 and TI 8, presently under construction, with a combined length of about 5.6 km. The final layout, optics design and correction scheme for these lines will be...
Autores principales: | Goddard, B, Mertens, V, Risselada, Thys |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/789329 |
Ejemplares similares
-
Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
por: Uythoven, J, et al.
Publicado: (2008) -
Commissioning of the LHC Beam Transfer Line TI 8
por: Uythoven, Jan, et al.
Publicado: (2005) -
TI 8 transfer line optics studies
por: Agapov, I, et al.
Publicado: (2008) -
Optics Studies of the LHC Beam Transfer Line TI 8
por: Arduini, Gianluigi, et al.
Publicado: (2005) -
Beam Stability of the LHC Beam Transfer Line TI8
por: Wenninger, Jörg, et al.
Publicado: (2005)