Cargando…
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
A fast extraction kicker system has been installed in the SPS and successfully used in extraction tests in 2003. It will serve to send beam to the anticlockwise LHC ring and the CNGS neutrino facility. The magnets and pulse generators have been recuperated from an earlier installation and upgraded t...
Autores principales: | Gaxiola, E, Antoine, A, Burkel, P, Carlier, E, Castronuovo, F, Ducimetière, L, Sillanoli, Y, Timmins, M, Uythoven, J |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/789780 |
Ejemplares similares
-
Upgrade and Tests of the SPS Fast Extraction Kicker System for LHC and CNGS
por: Humberto Gaxiola, Enrique, et al.
Publicado: (2004) -
Upgrade of the SPS extraction Kickers for LHC and CNGS Operation
por: Gaxiola, E H R, et al.
Publicado: (2002) -
Upgrading the Fast Extractions Kicker System in SPS LSS6
por: Barnes, M, et al.
Publicado: (2008) -
SPS extraction kicker magnet cooling design
por: Timmins, M, et al.
Publicado: (2006) -
Upgrading of the SPS injection kicker system for LHC requirements
por: Ducimetière, L, et al.
Publicado: (1998)