Cargando…

LHC Orbit Feedback Tests at the SPS

The real-time orbit feedback system foreseen for the LHC will be an essential component for reliable and safe machine operation. A test setup including a number of beam position monitors equipped with the LHC acquisition and readout system have been installed in the SPS ring to perform prototyping w...

Descripción completa

Detalles Bibliográficos
Autores principales: Steinhagen, Ralph J, Andersson, H, Jensen, L K, Jones, R, Lamont, M, Wenninger, J
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/793446
_version_ 1780904584697348096
author Steinhagen, Ralph J
Andersson, H
Jensen, L K
Jones, R
Lamont, M
Wenninger, J
author_facet Steinhagen, Ralph J
Andersson, H
Jensen, L K
Jones, R
Lamont, M
Wenninger, J
author_sort Steinhagen, Ralph J
collection CERN
description The real-time orbit feedback system foreseen for the LHC will be an essential component for reliable and safe machine operation. A test setup including a number of beam position monitors equipped with the LHC acquisition and readout system have been installed in the SPS ring to perform prototyping work on such an orbit feedback. A closed loop digital feedback was implemented and tested with LHC beams on the SPS during the 2003 machine run. The feedback loop was tested successfully at up to 100 Hz. The performance of the feedback loop and of its constituents will be described.
id cern-793446
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2004
record_format invenio
spelling cern-7934462023-05-31T13:21:41Zhttp://cds.cern.ch/record/793446engSteinhagen, Ralph JAndersson, HJensen, L KJones, RLamont, MWenninger, JLHC Orbit Feedback Tests at the SPSAccelerators and Storage RingsThe real-time orbit feedback system foreseen for the LHC will be an essential component for reliable and safe machine operation. A test setup including a number of beam position monitors equipped with the LHC acquisition and readout system have been installed in the SPS ring to perform prototyping work on such an orbit feedback. A closed loop digital feedback was implemented and tested with LHC beams on the SPS during the 2003 machine run. The feedback loop was tested successfully at up to 100 Hz. The performance of the feedback loop and of its constituents will be described.LHC-Project-Report-779CERN-LHC-Project-Report-779oai:cds.cern.ch:7934462004-08-17
spellingShingle Accelerators and Storage Rings
Steinhagen, Ralph J
Andersson, H
Jensen, L K
Jones, R
Lamont, M
Wenninger, J
LHC Orbit Feedback Tests at the SPS
title LHC Orbit Feedback Tests at the SPS
title_full LHC Orbit Feedback Tests at the SPS
title_fullStr LHC Orbit Feedback Tests at the SPS
title_full_unstemmed LHC Orbit Feedback Tests at the SPS
title_short LHC Orbit Feedback Tests at the SPS
title_sort lhc orbit feedback tests at the sps
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/793446
work_keys_str_mv AT steinhagenralphj lhcorbitfeedbacktestsatthesps
AT anderssonh lhcorbitfeedbacktestsatthesps
AT jensenlk lhcorbitfeedbacktestsatthesps
AT jonesr lhcorbitfeedbacktestsatthesps
AT lamontm lhcorbitfeedbacktestsatthesps
AT wenningerj lhcorbitfeedbacktestsatthesps