Cargando…
Beam Loss Monitoring on the CLIC Test Facility 3
With its 4kW average beam power, the CLIC test facility 3 (CTF3) is a machine where the control of beam losses is an important issue. Beam losses must be monitored all along the linac in order to keep the radiation level and the activation as low as possible. The Beam Loss Monitor (BLM) system curre...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/793456 |
_version_ | 1780904586465247232 |
---|---|
author | Lefèvre, T Braun, H Corsini, R Gasior, M Velasco, M Wood, M |
author_facet | Lefèvre, T Braun, H Corsini, R Gasior, M Velasco, M Wood, M |
author_sort | Lefèvre, T |
collection | CERN |
description | With its 4kW average beam power, the CLIC test facility 3 (CTF3) is a machine where the control of beam losses is an important issue. Beam losses must be monitored all along the linac in order to keep the radiation level and the activation as low as possible. The Beam Loss Monitor (BLM) system currently under development is described. The goal of our effort is to provide quantitative beam loss measurements. An intensive simulation work has been carried out in order to estimate the e+ - e- showers in a realistic accelerator environment. Based on these results, we investigate two scenarios to measure beam losses using a set of 48 detectors distributed along the machine. |
id | cern-793456 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2004 |
record_format | invenio |
spelling | cern-7934562023-07-20T15:03:53Zhttp://cds.cern.ch/record/793456engLefèvre, TBraun, HCorsini, RGasior, MVelasco, MWood, MBeam Loss Monitoring on the CLIC Test Facility 3Accelerators and Storage RingsWith its 4kW average beam power, the CLIC test facility 3 (CTF3) is a machine where the control of beam losses is an important issue. Beam losses must be monitored all along the linac in order to keep the radiation level and the activation as low as possible. The Beam Loss Monitor (BLM) system currently under development is described. The goal of our effort is to provide quantitative beam loss measurements. An intensive simulation work has been carried out in order to estimate the e+ - e- showers in a realistic accelerator environment. Based on these results, we investigate two scenarios to measure beam losses using a set of 48 detectors distributed along the machine.CERN-AB-2004-092CLIC-Note-611oai:cds.cern.ch:7934562004-08-17 |
spellingShingle | Accelerators and Storage Rings Lefèvre, T Braun, H Corsini, R Gasior, M Velasco, M Wood, M Beam Loss Monitoring on the CLIC Test Facility 3 |
title | Beam Loss Monitoring on the CLIC Test Facility 3 |
title_full | Beam Loss Monitoring on the CLIC Test Facility 3 |
title_fullStr | Beam Loss Monitoring on the CLIC Test Facility 3 |
title_full_unstemmed | Beam Loss Monitoring on the CLIC Test Facility 3 |
title_short | Beam Loss Monitoring on the CLIC Test Facility 3 |
title_sort | beam loss monitoring on the clic test facility 3 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/793456 |
work_keys_str_mv | AT lefevret beamlossmonitoringontheclictestfacility3 AT braunh beamlossmonitoringontheclictestfacility3 AT corsinir beamlossmonitoringontheclictestfacility3 AT gasiorm beamlossmonitoringontheclictestfacility3 AT velascom beamlossmonitoringontheclictestfacility3 AT woodm beamlossmonitoringontheclictestfacility3 |