Cargando…
Series Production of 13 kA Current Leads with Dry and Compact Warm Terminals
For the LHC magnet test benches 13 pairs of conventional helium vapour-cooled 13 kA current leads are required. The current leads have been designed and built by industry. Attention was given to economical and reliable design and to a design of the warm terminal in order to avoid any condensation. T...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/795004 |
_version_ | 1780904626772508672 |
---|---|
author | Andersen, T P Benda, V Vullierme, B |
author_facet | Andersen, T P Benda, V Vullierme, B |
author_sort | Andersen, T P |
collection | CERN |
description | For the LHC magnet test benches 13 pairs of conventional helium vapour-cooled 13 kA current leads are required. The current leads have been designed and built by industry. Attention was given to economical and reliable design and to a design of the warm terminal in order to avoid any condensation. Three pairs of them were tested at CERN. The dry warm terminal enables voltage test at 4.1 kV at cold condition. The paper describes construction details and compares calculated and measured values of the main parameters. |
id | cern-795004 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2004 |
record_format | invenio |
spelling | cern-7950042023-05-31T13:21:29Zhttp://cds.cern.ch/record/795004engAndersen, T PBenda, VVullierme, BSeries Production of 13 kA Current Leads with Dry and Compact Warm TerminalsAccelerators and Storage RingsFor the LHC magnet test benches 13 pairs of conventional helium vapour-cooled 13 kA current leads are required. The current leads have been designed and built by industry. Attention was given to economical and reliable design and to a design of the warm terminal in order to avoid any condensation. Three pairs of them were tested at CERN. The dry warm terminal enables voltage test at 4.1 kV at cold condition. The paper describes construction details and compares calculated and measured values of the main parameters.LHC-Project-Report-795CERN-LHC-Project-Report-795oai:cds.cern.ch:7950042004-09-02 |
spellingShingle | Accelerators and Storage Rings Andersen, T P Benda, V Vullierme, B Series Production of 13 kA Current Leads with Dry and Compact Warm Terminals |
title | Series Production of 13 kA Current Leads with Dry and Compact Warm Terminals |
title_full | Series Production of 13 kA Current Leads with Dry and Compact Warm Terminals |
title_fullStr | Series Production of 13 kA Current Leads with Dry and Compact Warm Terminals |
title_full_unstemmed | Series Production of 13 kA Current Leads with Dry and Compact Warm Terminals |
title_short | Series Production of 13 kA Current Leads with Dry and Compact Warm Terminals |
title_sort | series production of 13 ka current leads with dry and compact warm terminals |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/795004 |
work_keys_str_mv | AT andersentp seriesproductionof13kacurrentleadswithdryandcompactwarmterminals AT bendav seriesproductionof13kacurrentleadswithdryandcompactwarmterminals AT vulliermeb seriesproductionof13kacurrentleadswithdryandcompactwarmterminals |