MDT Commissioning Procedures Guidelines for Certifying RFI Chambers

Aim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test befo...

Descripción completa

Detalles Bibliográficos
Autores principales: Beretta, M, Bobbink, G, Branchini, P, Kourkoumelis, C, Dubbert, J, Gazis, E N, Hertenberger, R, Hurst, P, Kojine, A, Lanza, A, Marin, A, Mockett, P, Petridou, C, Tskhadadze, E G, Valente, P, Wotschack, J, Xie, Y, Zhao, Z
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/797325
Descripción
Sumario:Aim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test before final installation, while the latter will be first tested at a single chamber level (phase one), then installed into the Small and Big Wheel sectors (SW and BW), tested after the integration (phase two) and transported to the ATLAS pit for final wheel installation. The present document concerns all tests, including those of phase two for Endcap chambers, but it is possible that some specific tests, at the moment not planned, will be implemented during the Endcap phase two commissioning. It is composed of three sections: 1 â€" Guidelines for checking chamber conformity, where the main rules for declaring that chambers conform to the reference drawings and requirements are described; 2 â€" Commissioning tests, where the minimal required tests, and their procedures, are detailed; 3 â€" Database information, where the database structure and the minimal required information to be stored into it are illustrated and listed.