MDT Commissioning Procedures Guidelines for Certifying RFI Chambers
Aim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test befo...
Autores principales: | , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/797325 |
_version_ | 1780904681478815744 |
---|---|
author | Beretta, M Bobbink, G Branchini, P Kourkoumelis, C Dubbert, J Gazis, E N Hertenberger, R Hurst, P Kojine, A Lanza, A Marin, A Mockett, P Petridou, C Tskhadadze, E G Valente, P Wotschack, J Xie, Y Zhao, Z |
author_facet | Beretta, M Bobbink, G Branchini, P Kourkoumelis, C Dubbert, J Gazis, E N Hertenberger, R Hurst, P Kojine, A Lanza, A Marin, A Mockett, P Petridou, C Tskhadadze, E G Valente, P Wotschack, J Xie, Y Zhao, Z |
author_sort | Beretta, M |
collection | CERN |
description | Aim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test before final installation, while the latter will be first tested at a single chamber level (phase one), then installed into the Small and Big Wheel sectors (SW and BW), tested after the integration (phase two) and transported to the ATLAS pit for final wheel installation. The present document concerns all tests, including those of phase two for Endcap chambers, but it is possible that some specific tests, at the moment not planned, will be implemented during the Endcap phase two commissioning. It is composed of three sections: 1 â" Guidelines for checking chamber conformity, where the main rules for declaring that chambers conform to the reference drawings and requirements are described; 2 â" Commissioning tests, where the minimal required tests, and their procedures, are detailed; 3 â" Database information, where the database structure and the minimal required information to be stored into it are illustrated and listed. |
id | cern-797325 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2004 |
record_format | invenio |
spelling | cern-7973252019-09-30T06:29:59Zhttp://cds.cern.ch/record/797325engBeretta, MBobbink, GBranchini, PKourkoumelis, CDubbert, JGazis, E NHertenberger, RHurst, PKojine, ALanza, AMarin, AMockett, PPetridou, CTskhadadze, E GValente, PWotschack, JXie, YZhao, ZMDT Commissioning Procedures Guidelines for Certifying RFI ChambersDetectors and Experimental TechniquesAim of the document is the definition of a common set of guidelines and test procedures for commissioning the MDT chambers. Commissioning is different for Barrel and Endcap chambers. The former will be tested at a single chamber level before going to the ATLAS pit, ready for the last quick test before final installation, while the latter will be first tested at a single chamber level (phase one), then installed into the Small and Big Wheel sectors (SW and BW), tested after the integration (phase two) and transported to the ATLAS pit for final wheel installation. The present document concerns all tests, including those of phase two for Endcap chambers, but it is possible that some specific tests, at the moment not planned, will be implemented during the Endcap phase two commissioning. It is composed of three sections: 1 â" Guidelines for checking chamber conformity, where the main rules for declaring that chambers conform to the reference drawings and requirements are described; 2 â" Commissioning tests, where the minimal required tests, and their procedures, are detailed; 3 â" Database information, where the database structure and the minimal required information to be stored into it are illustrated and listed.ATL-MUON-2004-022CERN-ATL-MUON-2004-022ATL-COM-MUON-2004-018CERN-ATL-COM-MUON-2004-018oai:cds.cern.ch:7973252004 |
spellingShingle | Detectors and Experimental Techniques Beretta, M Bobbink, G Branchini, P Kourkoumelis, C Dubbert, J Gazis, E N Hertenberger, R Hurst, P Kojine, A Lanza, A Marin, A Mockett, P Petridou, C Tskhadadze, E G Valente, P Wotschack, J Xie, Y Zhao, Z MDT Commissioning Procedures Guidelines for Certifying RFI Chambers |
title | MDT Commissioning Procedures Guidelines for Certifying RFI Chambers |
title_full | MDT Commissioning Procedures Guidelines for Certifying RFI Chambers |
title_fullStr | MDT Commissioning Procedures Guidelines for Certifying RFI Chambers |
title_full_unstemmed | MDT Commissioning Procedures Guidelines for Certifying RFI Chambers |
title_short | MDT Commissioning Procedures Guidelines for Certifying RFI Chambers |
title_sort | mdt commissioning procedures guidelines for certifying rfi chambers |
topic | Detectors and Experimental Techniques |
url | http://cds.cern.ch/record/797325 |
work_keys_str_mv | AT berettam mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT bobbinkg mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT branchinip mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT kourkoumelisc mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT dubbertj mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT gazisen mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT hertenbergerr mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT hurstp mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT kojinea mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT lanzaa mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT marina mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT mockettp mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT petridouc mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT tskhadadzeeg mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT valentep mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT wotschackj mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT xiey mdtcommissioningproceduresguidelinesforcertifyingrfichambers AT zhaoz mdtcommissioningproceduresguidelinesforcertifyingrfichambers |