Post-mortem of the LTI project seen from AB/BDI
The test of the new transfer line between SPS point 4 and LHC point 8 was an important milestone for the AB/BDI group. As the group coordinator, I wish to describe how the installation and tests went from the BDI point of view and what was learnt that can be used in the future for the remaining inst...
Autor principal: | Jensen, L |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/809076 |
Ejemplares similares
-
Instrumentation needs for LTI
por: Meddahi, Malika
Publicado: (2001) -
Summary and Recommendations from the Review of LTI and CNGS Controls held at CERN on July 10th, 2001
por: Lamont, M, et al.
Publicado: (2001) -
The LHC Post-mortem System
por: Ciapala, Edmond, et al.
Publicado: (2002) -
The Organisation and Rationalisation of Java Based Applications in the BDI Group
por: Jackson, S, et al.
Publicado: (2005) -
Post-mortem of Experience with LEIR Controls
por: Pasinelli, S
Publicado: (2006)