Cargando…
Measurements of a prototype ladder for the TT station in a 120~GeV/c $pi^-$ beam
The results of a comprehensive measurement program carried out at the CERN X7 test facility in June 2004 on a prototype ladder readout via a long Kapton interconnect are described. For a shaping time consistent with LHCb operational requirements the most probable value of the S/N ratio is found to b...
Autores principales: | Agari, M, Bauer, M, Blake, T, Blouw, J, Esperante-Pereira, D, Gassner, J, Köstner, S, Lois, C, Needham, M, Perrin, A, Pugatch, V, Schmelling, M, Vázquez, P, Volyanskyy, D, Voss, H |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/811085 |
Ejemplares similares
-
Test-beam measurements on prototype ladders for the LHCb TT station and Inner Tracker
por: Agari, M, et al.
Publicado: (2004) -
Measurements of Prototype Ladders for the TT station with a Laser
por: Gassner, J, et al.
Publicado: (2005) -
Measurements of Prototype Ladders for the Silicon Tracker with Laser
por: Bernhard, R, et al.
Publicado: (2003) -
Performance of Long Ladders for the LHCb Silicon Tracker
por: Agari, M, et al.
Publicado: (2005) -
Layout and Expected Performance of the LHCb TT Station
por: Gassner, J, et al.
Publicado: (2004)