Cargando…
The team leading the commissioning of ALICE dipole magnet.
Left to right : Steven Philippin, Carlos de Almeida Martins, Alain Meynet and Detlef Swoboda (Head of the project for the ALICE dipole magnet).
Publicado: |
2005
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/816154 |
Ejemplares similares
-
Magnetic field (B) and voltage (U) characteristics of the ALICE dipole magnet.
Publicado: (2005) -
ALICE team : Christian Fabjan, Technical Coordinator, Detlef Swoboda, Dipole magnet Project Leader , Lars Leistam, Engineering and Integration Coordinator and Deputy Technical Coordinator
Publicado: (2005) -
ALICE: Simulated lead-lead collision
Publicado: (2003) -
On the night of 9 November, magnet project leader Marcello Losasso with members of the LHCb team, celebrating with champagne the successful start of the commissioning, a crucial milestone for the experiment.
Publicado: (2004) -
Assembly of the LHC's superconducting dipoles in 2003 at the German company Noell, one of the three European industrial centres of production for the 1 250 dipole magnets.
Publicado: (2004)