Cargando…

Induced radioactivity in a 4 MW target and its surroundings

An important aspect of a future CERN Neutrino Factory is the material activation arising from a 2.2 GeV, 4 MW proton beam striking a mercury target. An estimation of the hadronic inelastic interactions and the production of residual nuclei in the target, the magnetic horn, the decay tunnel, the surr...

Descripción completa

Detalles Bibliográficos
Autores principales: Agosteo, Stefano, Magistris, M, Otto, Thomas, Silari, Marco
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/816631
Descripción
Sumario:An important aspect of a future CERN Neutrino Factory is the material activation arising from a 2.2 GeV, 4 MW proton beam striking a mercury target. An estimation of the hadronic inelastic interactions and the production of residual nuclei in the target, the magnetic horn, the decay tunnel, the surrounding rock and a downstream dump was performed by the Monte Carlo hadronic cascade code FLUKA. The aim was both to assess the dose equivalent rate to be expected during maintenance work and to evaluate the amount of residual radioactivity, which will have to be disposed of after the facility has ceased operation.