Cargando…

ATLAS electromagnetic calorimeter, construction and test of a large scale system

The construction of the ATLAS liquid argon presamplers and accordion calorimeters are about to be completed. The first half-length barrel wheel is already installed in the cryostat and assembly of the second wheel is about to be finished. Modules for the first end-cap wheel are ready and the assembl...

Descripción completa

Detalles Bibliográficos
Autor principal: Tayalati, Y
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2004.03.180
http://cds.cern.ch/record/816804
_version_ 1780905440738017280
author Tayalati, Y
author_facet Tayalati, Y
author_sort Tayalati, Y
collection CERN
description The construction of the ATLAS liquid argon presamplers and accordion calorimeters are about to be completed. The first half-length barrel wheel is already installed in the cryostat and assembly of the second wheel is about to be finished. Modules for the first end-cap wheel are ready and the assembly of the first wheel is well under way. From 55000 output channels of the first barrel wheel only four channels are malfunctioning and a very small fraction of high voltage area has showed problems, ~0.15%. After a review of the construction, production, and assembly, results concerning the energy and position resolution are shown.
id cern-816804
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2004
record_format invenio
spelling cern-8168042019-09-30T06:29:59Zdoi:10.1016/j.nima.2004.03.180http://cds.cern.ch/record/816804engTayalati, YATLAS electromagnetic calorimeter, construction and test of a large scale systemDetectors and Experimental TechniquesThe construction of the ATLAS liquid argon presamplers and accordion calorimeters are about to be completed. The first half-length barrel wheel is already installed in the cryostat and assembly of the second wheel is about to be finished. Modules for the first end-cap wheel are ready and the assembly of the first wheel is well under way. From 55000 output channels of the first barrel wheel only four channels are malfunctioning and a very small fraction of high voltage area has showed problems, ~0.15%. After a review of the construction, production, and assembly, results concerning the energy and position resolution are shown.oai:cds.cern.ch:8168042004
spellingShingle Detectors and Experimental Techniques
Tayalati, Y
ATLAS electromagnetic calorimeter, construction and test of a large scale system
title ATLAS electromagnetic calorimeter, construction and test of a large scale system
title_full ATLAS electromagnetic calorimeter, construction and test of a large scale system
title_fullStr ATLAS electromagnetic calorimeter, construction and test of a large scale system
title_full_unstemmed ATLAS electromagnetic calorimeter, construction and test of a large scale system
title_short ATLAS electromagnetic calorimeter, construction and test of a large scale system
title_sort atlas electromagnetic calorimeter, construction and test of a large scale system
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1016/j.nima.2004.03.180
http://cds.cern.ch/record/816804
work_keys_str_mv AT tayalatiy atlaselectromagneticcalorimeterconstructionandtestofalargescalesystem