Cargando…
Test facility for investigation of heating of 30 GHz accelerating structure imitator for the CLIC project
Since 2001 an experimental test facility for investigation of lifetime of a copper material, with respect to multiple RF pulse actions, was set up on the basis of the JINR (Dubna) FEM oscillator, in collaboration with IAP RAS (Nizhny Novgorod). A high-Q copper cavity, which simulates the parameters...
Autores principales: | Elzhov, A V, Ginzburg, N S, Kaminsky, A K, Kuzikov, S V, Perelshtejn, E A, Peskov, N Yu, Petelin, M I, Sedykh, S N, Sergeev, A P, Sergeev, A S, Syratchev, I V, Zaitsev, N I |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2004.04.052 http://cds.cern.ch/record/816810 |
Ejemplares similares
-
Studies of Thermal Fatigue Caused by Pulsed RF Heating
por: Kuzikov, Sergey Vladimirovich, et al.
Publicado: (2006) -
Study of Modified TBA Driver Scheme
por: Elzhov, A V, et al.
Publicado: (1999) -
30 GHz High Power Production for CLIC
por: Syratchev, I V
Publicado: (2005) -
FEL-Oscillator for Feeding of High-Gradient Accelerating Structure
por: Goldenberg, C A, et al.
Publicado: (1999) -
Generation of 30 GHz rf power in the CLIC test facility
por: Hübner, K
Publicado: (1991)