Cargando…
The LHC's equipment all in step
<b>Over 80% of the control equipment for the LHC will be connected by a special communication network known as WorldFIP, which has been chosen for its very precise timing, excellent operating performance and robustness in difficult environments. Over 350 kilometres of this network are currentl...
Lenguaje: | eng fre |
---|---|
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/821465 |
Ejemplares similares
-
Four giant steps for the LHC
Publicado: (2006) -
LHC magnets: first steps in the tunnel
Publicado: (2004) -
Important step towards the LHC
Publicado: (2001) -
All systems go for LHC quadrupoles
Publicado: (2003) -
The 4.5K refrigerators for the LHC are all present and correct!
Publicado: (2004)