Cargando…
Challenges facing the Generation of MW Proton Beams using Rapid Cycling Synchrotrons
Autor principal: | Irie, Yoshiro |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/822769 |
Ejemplares similares
-
Challenges facing the Generation of MW Proton Beams using Rapid Cycling Synchrotrons
por: Irie, Yoshiro
Publicado: (2004) -
Cost and Performance of Rapid-Cycling Proton Synchrotrons
por: Johnson, R P, et al.
Publicado: (2001) -
Upgrading the AGS to 1 MW Proton Beam Power
por: Roser, T, et al.
Publicado: (2001) -
Upgrade Study of INR Proton Linac for Production of 3 MW Beam
por: Kravchuk, L V, et al.
Publicado: (1999) -
Rapid-cycling synchrotrons as the proton source for a factory at CERN: 'draft' scenarios
por: Schönauer, Horst Otto
Publicado: (1999)