Cargando…
TT40 Damage during 2004 High Intensity SPS Extraction
During high intensity extraction on 25/10/04 an incident occurred in which the vacuum chamber of the TT40 magnet QTRF4002 was badly damaged. The beam was a 450 GeV full LHC injection batch of 3.4 1013 p+ in 288 bunches, and was extracted from SPS LSS4 with the wrong trajectory. Prior to the fatal ex...
Autores principales: | Goddard, B, Kain, V, Mertens, V, Uythoven, J, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/825806 |
Ejemplares similares
-
Beam Commissioning of the SPS LSS 4 Extraction and the TT40 Transfer Line
por: Goddard, B, et al.
Publicado: (2004) -
Commissioning of the Beam Interlock System for the TT40 and TT41 Transfer Lines of the SPS
por: Wenninger, J, et al.
Publicado: (2007) -
Beam Commissioning of the SPS LSS6 Extraction and TT60 for LHC
por: Balhan, B, et al.
Publicado: (2007) -
Experience with the TI 8 and TT40 tests
por: Uythoven, J
Publicado: (2005) -
High Intensity Commissioning of the SPS LSS4 extraction for CNGS
por: Kain, V, et al.
Publicado: (2007)