Cargando…
Material Budget Calculation for the LHCb TT Station
An updated calculation of the material budget of the TT station is presented. For $eta < 4.2$ the amount of material is found to be similar to that assumed in the current LHCb Monte Carlo. For $eta > 4.2$ a significant increase in the amount of material is found. This is due to the insulating...
Autores principales: | Needham, M, Wenger, A |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/830367 |
Ejemplares similares
-
Layout and Expected Performance of the LHCb TT Station
por: Gassner, J, et al.
Publicado: (2004) -
Estimation of the material budget of the LHCb detector
por: Needham, M, et al.
Publicado: (2007) -
Test-beam measurements on prototype ladders for the LHCb TT station and Inner Tracker
por: Agari, M, et al.
Publicado: (2004) -
Measurements of Prototype Ladders for the TT station with a Laser
por: Gassner, J, et al.
Publicado: (2005) -
Capacitance measurements on silicon micro-strip detectors for the TT station of the LHCb experiment
por: Gassner, J, et al.
Publicado: (2003)