Cargando…
Status of Production of the Superconducting Matching Quadrupoles for the LHC Insertions
Special individually powered superconducting quadrupoles are required for the LHC insertions. These units comprise quadrupole magnets of the MQM and MQY types and range in length from 5.4 m to 11.4 m. In total, 82 insertion quadrupoles will be assembled at CERN. In this paper we present the advance...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2005.849503 http://cds.cern.ch/record/833203 |
_version_ | 1780905881530007552 |
---|---|
author | Ostojic, R Catalan-Lasheras, N Kirby, G A Pérez, J C Prin, H Venturini-Delsolaro, W |
author_facet | Ostojic, R Catalan-Lasheras, N Kirby, G A Pérez, J C Prin, H Venturini-Delsolaro, W |
author_sort | Ostojic, R |
collection | CERN |
description | Special individually powered superconducting quadrupoles are required for the LHC insertions. These units comprise quadrupole magnets of the MQM and MQY types and range in length from 5.4 m to 11.4 m. In total, 82 insertion quadrupoles will be assembled at CERN. In this paper we present the advance in construction of the magnets and report on the performance of the first series built units, including power tests and alignment of the cold masses. |
id | cern-833203 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2005 |
record_format | invenio |
spelling | cern-8332032023-05-31T13:24:05Zdoi:10.1109/TASC.2005.849503http://cds.cern.ch/record/833203engOstojic, RCatalan-Lasheras, NKirby, G APérez, J CPrin, HVenturini-Delsolaro, WStatus of Production of the Superconducting Matching Quadrupoles for the LHC InsertionsAccelerators and Storage RingsSpecial individually powered superconducting quadrupoles are required for the LHC insertions. These units comprise quadrupole magnets of the MQM and MQY types and range in length from 5.4 m to 11.4 m. In total, 82 insertion quadrupoles will be assembled at CERN. In this paper we present the advance in construction of the magnets and report on the performance of the first series built units, including power tests and alignment of the cold masses.LHC-Project-Report-806CERN-LHC-Project-Report-806oai:cds.cern.ch:8332032005-03-24 |
spellingShingle | Accelerators and Storage Rings Ostojic, R Catalan-Lasheras, N Kirby, G A Pérez, J C Prin, H Venturini-Delsolaro, W Status of Production of the Superconducting Matching Quadrupoles for the LHC Insertions |
title | Status of Production of the Superconducting Matching Quadrupoles for the LHC Insertions |
title_full | Status of Production of the Superconducting Matching Quadrupoles for the LHC Insertions |
title_fullStr | Status of Production of the Superconducting Matching Quadrupoles for the LHC Insertions |
title_full_unstemmed | Status of Production of the Superconducting Matching Quadrupoles for the LHC Insertions |
title_short | Status of Production of the Superconducting Matching Quadrupoles for the LHC Insertions |
title_sort | status of production of the superconducting matching quadrupoles for the lhc insertions |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/TASC.2005.849503 http://cds.cern.ch/record/833203 |
work_keys_str_mv | AT ostojicr statusofproductionofthesuperconductingmatchingquadrupolesforthelhcinsertions AT catalanlasherasn statusofproductionofthesuperconductingmatchingquadrupolesforthelhcinsertions AT kirbyga statusofproductionofthesuperconductingmatchingquadrupolesforthelhcinsertions AT perezjc statusofproductionofthesuperconductingmatchingquadrupolesforthelhcinsertions AT prinh statusofproductionofthesuperconductingmatchingquadrupolesforthelhcinsertions AT venturinidelsolarow statusofproductionofthesuperconductingmatchingquadrupolesforthelhcinsertions |