Cargando…

Overview of the control system for the ISCOOL project

In the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorpo...

Descripción completa

Detalles Bibliográficos
Autores principales: Podadera-Aliseda, I, Giles, T
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/835266
_version_ 1780905962322788352
author Podadera-Aliseda, I
Giles, T
author_facet Podadera-Aliseda, I
Giles, T
author_sort Podadera-Aliseda, I
collection CERN
description In the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorporated. Since it would be part of the normal operation at ISOLDE, besides of fully compatible with the existing control system, ISCOOL must have a friendly and robust control, allowing a continuous and stable operation of the HRS separator. In this report a summary of the equipment required, the scheme and the requirements of the control system for the commissioning are presented.
id cern-835266
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-8352662019-09-30T06:29:59Zhttp://cds.cern.ch/record/835266engPodadera-Aliseda, IGiles, TOverview of the control system for the ISCOOL projectAccelerators and Storage RingsIn the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorporated. Since it would be part of the normal operation at ISOLDE, besides of fully compatible with the existing control system, ISCOOL must have a friendly and robust control, allowing a continuous and stable operation of the HRS separator. In this report a summary of the equipment required, the scheme and the requirements of the control system for the commissioning are presented.AB-Note-2005-024CERN-AB-Note-2005-024oai:cds.cern.ch:8352662006-03-31
spellingShingle Accelerators and Storage Rings
Podadera-Aliseda, I
Giles, T
Overview of the control system for the ISCOOL project
title Overview of the control system for the ISCOOL project
title_full Overview of the control system for the ISCOOL project
title_fullStr Overview of the control system for the ISCOOL project
title_full_unstemmed Overview of the control system for the ISCOOL project
title_short Overview of the control system for the ISCOOL project
title_sort overview of the control system for the iscool project
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/835266
work_keys_str_mv AT podaderaalisedai overviewofthecontrolsystemfortheiscoolproject
AT gilest overviewofthecontrolsystemfortheiscoolproject