Cargando…
Overview of the control system for the ISCOOL project
In the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorpo...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/835266 |
_version_ | 1780905962322788352 |
---|---|
author | Podadera-Aliseda, I Giles, T |
author_facet | Podadera-Aliseda, I Giles, T |
author_sort | Podadera-Aliseda, I |
collection | CERN |
description | In the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorporated. Since it would be part of the normal operation at ISOLDE, besides of fully compatible with the existing control system, ISCOOL must have a friendly and robust control, allowing a continuous and stable operation of the HRS separator. In this report a summary of the equipment required, the scheme and the requirements of the control system for the commissioning are presented. |
id | cern-835266 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2006 |
record_format | invenio |
spelling | cern-8352662019-09-30T06:29:59Zhttp://cds.cern.ch/record/835266engPodadera-Aliseda, IGiles, TOverview of the control system for the ISCOOL projectAccelerators and Storage RingsIn the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorporated. Since it would be part of the normal operation at ISOLDE, besides of fully compatible with the existing control system, ISCOOL must have a friendly and robust control, allowing a continuous and stable operation of the HRS separator. In this report a summary of the equipment required, the scheme and the requirements of the control system for the commissioning are presented.AB-Note-2005-024CERN-AB-Note-2005-024oai:cds.cern.ch:8352662006-03-31 |
spellingShingle | Accelerators and Storage Rings Podadera-Aliseda, I Giles, T Overview of the control system for the ISCOOL project |
title | Overview of the control system for the ISCOOL project |
title_full | Overview of the control system for the ISCOOL project |
title_fullStr | Overview of the control system for the ISCOOL project |
title_full_unstemmed | Overview of the control system for the ISCOOL project |
title_short | Overview of the control system for the ISCOOL project |
title_sort | overview of the control system for the iscool project |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/835266 |
work_keys_str_mv | AT podaderaalisedai overviewofthecontrolsystemfortheiscoolproject AT gilest overviewofthecontrolsystemfortheiscoolproject |