Cargando…
Overview of the control system for the ISCOOL project
In the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorpo...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/835266 |