Cargando…
Overview of the control system for the ISCOOL project
In the new ISCOOL (ISolde COOLer and buncher) project the control system must be totally integrated in ISOLDE control system. In addition, controls for a new vacuum section (valves, turbopumps, forepumps), two new quadrupoles (injection and extraction from RFQCB) and the RFQCB itself must be incorpo...
Autores principales: | Podadera-Aliseda, I, Giles, T |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/835266 |
Ejemplares similares
-
ISCOOL project: cooling and bunching RIBs for ISOLDE
por: Aliseda, I P
Publicado: (2006) -
New developments on preparation of cooled and bunched Radioactive Ion beams at ISOL facilities: the ISCOOL project and the rotating wall cooling
por: Podadera-Aliseda, I
Publicado: (2006) -
Precision Beam Position Monitor for EUROTeV
por: Guillot Vignot, F, et al.
Publicado: (2009) -
Status of the design of a Wide Band beam Current Monitor (WBCM) for EUROTeV
por: Caspers, Friedhelm, et al.
Publicado: (2006) -
Super-B project overview
por: Biagini, M E, et al.
Publicado: (2010)