Cargando…

Commissioning of the LHC Beam Transfer Line TI 8

The first of the two LHC transfer lines was commissioned in autumn 2004. Beam reached an absorber block located some 2.5 km downstream of the SPS extraction point at the first shot, without the need of any threading. The hardware preparation and commissioning phase will be summarised, followed by a...

Descripción completa

Detalles Bibliográficos
Autores principales: Uythoven, Jan, Arduini, Gianluigi, Chao Yu Chiu, Goddard, Brennan, Jacquet, Delphine, Kain, Verena, Lamont, Mike, Mertens, Volker, Spinks, Alan, Wenninger, Jörg
Lenguaje:eng
Publicado: 2005
Materias:
Acceso en línea:http://cds.cern.ch/record/841097
Descripción
Sumario:The first of the two LHC transfer lines was commissioned in autumn 2004. Beam reached an absorber block located some 2.5 km downstream of the SPS extraction point at the first shot, without the need of any threading. The hardware preparation and commissioning phase will be summarised, followed by a description of the beam tests and their results regarding optics and other line parameters, including the experience gained with beam instrumentation, the control system and the machine protection equipment.