Commissioning of the LHC Beam Transfer Line TI 8

The first of the two LHC transfer lines was commissioned in autumn 2004. Beam reached an absorber block located some 2.5 km downstream of the SPS extraction point at the first shot, without the need of any threading. The hardware preparation and commissioning phase will be summarised, followed by a...

Descripción completa

Detalles Bibliográficos
Autores principales: Uythoven, Jan, Arduini, Gianluigi, Chao Yu Chiu, Goddard, Brennan, Jacquet, Delphine, Kain, Verena, Lamont, Mike, Mertens, Volker, Spinks, Alan, Wenninger, Jörg
Lenguaje:eng
Publicado: 2005
Materias:
Acceso en línea:http://cds.cern.ch/record/841097
_version_ 1780906246306529280
author Uythoven, Jan
Arduini, Gianluigi
Chao Yu Chiu
Goddard, Brennan
Jacquet, Delphine
Kain, Verena
Lamont, Mike
Mertens, Volker
Spinks, Alan
Wenninger, Jörg
author_facet Uythoven, Jan
Arduini, Gianluigi
Chao Yu Chiu
Goddard, Brennan
Jacquet, Delphine
Kain, Verena
Lamont, Mike
Mertens, Volker
Spinks, Alan
Wenninger, Jörg
author_sort Uythoven, Jan
collection CERN
description The first of the two LHC transfer lines was commissioned in autumn 2004. Beam reached an absorber block located some 2.5 km downstream of the SPS extraction point at the first shot, without the need of any threading. The hardware preparation and commissioning phase will be summarised, followed by a description of the beam tests and their results regarding optics and other line parameters, including the experience gained with beam instrumentation, the control system and the machine protection equipment.
id cern-841097
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2005
record_format invenio
spelling cern-8410972023-05-31T13:21:02Zhttp://cds.cern.ch/record/841097engUythoven, JanArduini, GianluigiChao Yu ChiuGoddard, BrennanJacquet, DelphineKain, VerenaLamont, MikeMertens, VolkerSpinks, AlanWenninger, JörgCommissioning of the LHC Beam Transfer Line TI 8Accelerators and Storage RingsThe first of the two LHC transfer lines was commissioned in autumn 2004. Beam reached an absorber block located some 2.5 km downstream of the SPS extraction point at the first shot, without the need of any threading. The hardware preparation and commissioning phase will be summarised, followed by a description of the beam tests and their results regarding optics and other line parameters, including the experience gained with beam instrumentation, the control system and the machine protection equipment.LHC-Project-Report-816CERN-LHC-Project-Report-816oai:cds.cern.ch:8410972005-06-14
spellingShingle Accelerators and Storage Rings
Uythoven, Jan
Arduini, Gianluigi
Chao Yu Chiu
Goddard, Brennan
Jacquet, Delphine
Kain, Verena
Lamont, Mike
Mertens, Volker
Spinks, Alan
Wenninger, Jörg
Commissioning of the LHC Beam Transfer Line TI 8
title Commissioning of the LHC Beam Transfer Line TI 8
title_full Commissioning of the LHC Beam Transfer Line TI 8
title_fullStr Commissioning of the LHC Beam Transfer Line TI 8
title_full_unstemmed Commissioning of the LHC Beam Transfer Line TI 8
title_short Commissioning of the LHC Beam Transfer Line TI 8
title_sort commissioning of the lhc beam transfer line ti 8
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/841097
work_keys_str_mv AT uythovenjan commissioningofthelhcbeamtransferlineti8
AT arduinigianluigi commissioningofthelhcbeamtransferlineti8
AT chaoyuchiu commissioningofthelhcbeamtransferlineti8
AT goddardbrennan commissioningofthelhcbeamtransferlineti8
AT jacquetdelphine commissioningofthelhcbeamtransferlineti8
AT kainverena commissioningofthelhcbeamtransferlineti8
AT lamontmike commissioningofthelhcbeamtransferlineti8
AT mertensvolker commissioningofthelhcbeamtransferlineti8
AT spinksalan commissioningofthelhcbeamtransferlineti8
AT wenningerjorg commissioningofthelhcbeamtransferlineti8