Cargando…
Point 5: installation of the 800mm pipe before the underground settling bank.
Autor principal: | |
---|---|
Lenguaje: | eng fre |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/842171 |
_version_ | 1780906414583054336 |
---|---|
author | Jean-Luc Caron |
author_facet | Jean-Luc Caron |
author_sort | Jean-Luc Caron |
collection | CERN |
id | cern-842171 |
institution | Organización Europea para la Investigación Nuclear |
language | eng fre |
publishDate | 1998 |
record_format | invenio |
spelling | cern-8421712019-09-30T06:29:59Zhttp://cds.cern.ch/record/842171engfreJean-Luc CaronPoint 5: installation of the 800mm pipe before the underground settling bank.Civil engineeringLHC-PHO-1998-227oai:cds.cern.ch:8421711998 |
spellingShingle | Civil engineering Jean-Luc Caron Point 5: installation of the 800mm pipe before the underground settling bank. |
title | Point 5: installation of the 800mm pipe before the underground settling bank. |
title_full | Point 5: installation of the 800mm pipe before the underground settling bank. |
title_fullStr | Point 5: installation of the 800mm pipe before the underground settling bank. |
title_full_unstemmed | Point 5: installation of the 800mm pipe before the underground settling bank. |
title_short | Point 5: installation of the 800mm pipe before the underground settling bank. |
title_sort | point 5: installation of the 800mm pipe before the underground settling bank. |
topic | Civil engineering |
url | http://cds.cern.ch/record/842171 |
work_keys_str_mv | AT jeanluccaron point5installationofthe800mmpipebeforetheundergroundsettlingbank |