Cargando…
Point 5: installation of the 800mm pipe before the underground settling bank.
Autor principal: | Jean-Luc Caron |
---|---|
Lenguaje: | eng fre |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/842171 |
Ejemplares similares
-
Point 5: installation of the 800mm pipe before the underground settling bank.
por: Jean-Luc Caron
Publicado: (1998) -
Installation of a EDF 66KV underground power line for Point 1, along the "route de l' Europe".
por: Jean-Luc Caron
Publicado: (1998) -
Longitudinal section of the underground works at Point 2.
por: Jean-Luc Caron
Publicado: (1998) -
Diversion of the water pipes at LHC's Point 1.
por: Jean-Luc Caron
Publicado: (1997) -
Diversion of the water pipes at LHC's Point 1.
por: Jean-Luc Caron
Publicado: (1997)