Cargando…

Point 5: installation of the 800mm pipe before the underground settling bank.

Detalles Bibliográficos
Autor principal: Jean-Luc Caron
Lenguaje:eng
fre
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/842172
_version_ 1780906414801158144
author Jean-Luc Caron
author_facet Jean-Luc Caron
author_sort Jean-Luc Caron
collection CERN
id cern-842172
institution Organización Europea para la Investigación Nuclear
language eng
fre
publishDate 1998
record_format invenio
spelling cern-8421722019-09-30T06:29:59Zhttp://cds.cern.ch/record/842172engfreJean-Luc CaronPoint 5: installation of the 800mm pipe before the underground settling bank.Civil engineeringLHC-PHO-1998-228oai:cds.cern.ch:8421721998
spellingShingle Civil engineering
Jean-Luc Caron
Point 5: installation of the 800mm pipe before the underground settling bank.
title Point 5: installation of the 800mm pipe before the underground settling bank.
title_full Point 5: installation of the 800mm pipe before the underground settling bank.
title_fullStr Point 5: installation of the 800mm pipe before the underground settling bank.
title_full_unstemmed Point 5: installation of the 800mm pipe before the underground settling bank.
title_short Point 5: installation of the 800mm pipe before the underground settling bank.
title_sort point 5: installation of the 800mm pipe before the underground settling bank.
topic Civil engineering
url http://cds.cern.ch/record/842172
work_keys_str_mv AT jeanluccaron point5installationofthe800mmpipebeforetheundergroundsettlingbank