Cargando…
Excavation of a pit using the moulded wall method.
Autor principal: | |
---|---|
Lenguaje: | eng fre |
Publicado: |
1997
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/842347 |
_version_ | 1780906452362199040 |
---|---|
author | Serge Dailler |
author_facet | Serge Dailler |
author_sort | Serge Dailler |
collection | CERN |
id | cern-842347 |
institution | Organización Europea para la Investigación Nuclear |
language | eng fre |
publishDate | 1997 |
record_format | invenio |
spelling | cern-8423472019-09-30T06:29:59Zhttp://cds.cern.ch/record/842347engfreSerge DaillerExcavation of a pit using the moulded wall method.Civil engineeringLHC-PHO-1997-137oai:cds.cern.ch:8423471997 |
spellingShingle | Civil engineering Serge Dailler Excavation of a pit using the moulded wall method. |
title | Excavation of a pit using the moulded wall method. |
title_full | Excavation of a pit using the moulded wall method. |
title_fullStr | Excavation of a pit using the moulded wall method. |
title_full_unstemmed | Excavation of a pit using the moulded wall method. |
title_short | Excavation of a pit using the moulded wall method. |
title_sort | excavation of a pit using the moulded wall method. |
topic | Civil engineering |
url | http://cds.cern.ch/record/842347 |
work_keys_str_mv | AT sergedailler excavationofapitusingthemouldedwallmethod |