30 GHz Power Production in CTF3

One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30...

Descripción completa

Detalles Bibliográficos
Autores principales: Wuensch, Walter, Achard, Claude, Braun, Hans Heinrich, Carron, Georges, Corsini, Roberto, Grudiev, Alexei, Heikkinen, Samuli Tapio, Schulte, Daniel, Sladen, Jonathan P H, Syratchev, Igor V, Tecker, Frank A, Wilson, Ian H
Lenguaje:eng
Publicado: 2005
Materias:
Acceso en línea:http://cds.cern.ch/record/844031
Descripción
Sumario:One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30 GHz power with a pulse length of 74 ns and a repetition rate of 16 Hz were delivered to the high-gradient test area. This will allow operation of test accelerating structures in the first CTF3 run of 2005 up to the nominal CLIC accelerating gradient of 150 MV/m and beyond the nominal pulse length. The system is described and the performances of the CTF3 linac, beam line and the rf components are reviewed.