Cargando…

30 GHz Power Production in CTF3

One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30...

Descripción completa

Detalles Bibliográficos
Autores principales: Wuensch, Walter, Achard, Claude, Braun, Hans Heinrich, Carron, Georges, Corsini, Roberto, Grudiev, Alexei, Heikkinen, Samuli Tapio, Schulte, Daniel, Sladen, Jonathan P H, Syratchev, Igor V, Tecker, Frank A, Wilson, Ian H
Lenguaje:eng
Publicado: 2005
Materias:
Acceso en línea:http://cds.cern.ch/record/844031
_version_ 1780906721164656640
author Wuensch, Walter
Achard, Claude
Braun, Hans Heinrich
Carron, Georges
Corsini, Roberto
Grudiev, Alexei
Heikkinen, Samuli Tapio
Schulte, Daniel
Sladen, Jonathan P H
Syratchev, Igor V
Tecker, Frank A
Wilson, Ian H
author_facet Wuensch, Walter
Achard, Claude
Braun, Hans Heinrich
Carron, Georges
Corsini, Roberto
Grudiev, Alexei
Heikkinen, Samuli Tapio
Schulte, Daniel
Sladen, Jonathan P H
Syratchev, Igor V
Tecker, Frank A
Wilson, Ian H
author_sort Wuensch, Walter
collection CERN
description One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30 GHz power with a pulse length of 74 ns and a repetition rate of 16 Hz were delivered to the high-gradient test area. This will allow operation of test accelerating structures in the first CTF3 run of 2005 up to the nominal CLIC accelerating gradient of 150 MV/m and beyond the nominal pulse length. The system is described and the performances of the CTF3 linac, beam line and the rf components are reviewed.
id cern-844031
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2005
record_format invenio
spelling cern-8440312023-07-20T15:01:49Zhttp://cds.cern.ch/record/844031engWuensch, WalterAchard, ClaudeBraun, Hans HeinrichCarron, GeorgesCorsini, RobertoGrudiev, AlexeiHeikkinen, Samuli TapioSchulte, DanielSladen, Jonathan P HSyratchev, Igor VTecker, Frank AWilson, Ian H30 GHz Power Production in CTF3Accelerators and Storage RingsOne of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30 GHz power with a pulse length of 74 ns and a repetition rate of 16 Hz were delivered to the high-gradient test area. This will allow operation of test accelerating structures in the first CTF3 run of 2005 up to the nominal CLIC accelerating gradient of 150 MV/m and beyond the nominal pulse length. The system is described and the performances of the CTF3 linac, beam line and the rf components are reviewed.CERN-AB-2005-030CLIC-Note-635oai:cds.cern.ch:8440312005-06-17
spellingShingle Accelerators and Storage Rings
Wuensch, Walter
Achard, Claude
Braun, Hans Heinrich
Carron, Georges
Corsini, Roberto
Grudiev, Alexei
Heikkinen, Samuli Tapio
Schulte, Daniel
Sladen, Jonathan P H
Syratchev, Igor V
Tecker, Frank A
Wilson, Ian H
30 GHz Power Production in CTF3
title 30 GHz Power Production in CTF3
title_full 30 GHz Power Production in CTF3
title_fullStr 30 GHz Power Production in CTF3
title_full_unstemmed 30 GHz Power Production in CTF3
title_short 30 GHz Power Production in CTF3
title_sort 30 ghz power production in ctf3
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/844031
work_keys_str_mv AT wuenschwalter 30ghzpowerproductioninctf3
AT achardclaude 30ghzpowerproductioninctf3
AT braunhansheinrich 30ghzpowerproductioninctf3
AT carrongeorges 30ghzpowerproductioninctf3
AT corsiniroberto 30ghzpowerproductioninctf3
AT grudievalexei 30ghzpowerproductioninctf3
AT heikkinensamulitapio 30ghzpowerproductioninctf3
AT schultedaniel 30ghzpowerproductioninctf3
AT sladenjonathanph 30ghzpowerproductioninctf3
AT syratchevigorv 30ghzpowerproductioninctf3
AT teckerfranka 30ghzpowerproductioninctf3
AT wilsonianh 30ghzpowerproductioninctf3