Cargando…
30 GHz Power Production in CTF3
One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30...
Autores principales: | Wuensch, Walter, Achard, Claude, Braun, Hans Heinrich, Carron, Georges, Corsini, Roberto, Grudiev, Alexei, Heikkinen, Samuli Tapio, Schulte, Daniel, Sladen, Jonathan P H, Syratchev, Igor V, Tecker, Frank A, Wilson, Ian H |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/844031 |
Ejemplares similares
-
30 GHz RF Components for CTF3
por: Grudiev, Alexei, et al.
Publicado: (2006) -
30 GHz RF Pulse Stretcher for CTF2
por: Braun, Hans Heinrich, et al.
Publicado: (2003) -
A High-Gradient Test of a 30 GHz Molybdenum-Iris Structure
por: Wuensch, Walter, et al.
Publicado: (2006) -
A high-gradient test of a 30 GHz copper accelerating structure
por: Corsini, Roberto, et al.
Publicado: (2006) -
30 GHz High-Gradient Accelerating Structure Test Results
por: Rodríguez, J, et al.
Publicado: (2007)