Cargando…
Status of CERN Chopper Driver and the Solid State Alternative
The Superconducting H- Linac under study at CERN requires a high performance 3 MeV chopper. It has to establish the required beam time-structure by dumping part of the beam exiting the RFQ in 0.6 ms bursts of 1 ns bunches spaced by 2.84 ns and repeated at 50 Hz. For maximum flexibility, the system m...
Autor principal: | Paoluzzi, M |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/854660 |
Ejemplares similares
-
A Fast 650V Chopper Driver
por: Paoluzzi, M M
Publicado: (2011) -
A Fast 650V Chopper Driver
por: Paoluzzi, Mauro
Publicado: (2010) -
CERN Chopper final report
por: Paoluzzi, M, et al.
Publicado: (2008) -
The CERN-SPL Chopper Concept and Final Layout
por: Caspers, Friedhelm, et al.
Publicado: (2004) -
Design of a chopper line for the CERN SPL
por: Caspers, Friedhelm, et al.
Publicado: (2002)