Cargando…
Beam Stability of the LHC Beam Transfer Line TI8
Injection of beam into the LHC at 450 GeV/c proceeds over two 2.7 km long transfer lines from the SPS. The small aperture of the LHC at injection imposes tight constraints on the stability of the beam transfer. The first transfer line TI 8 was commissioned in the fall of 2004 with low intensity beam...
Autores principales: | Wenninger, Jörg, Goddard, Brennan, Kain, Verena, Uythoven, Jan |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/858491 |
Ejemplares similares
-
Commissioning of the LHC Beam Transfer Line TI 8
por: Uythoven, Jan, et al.
Publicado: (2005) -
Optics Studies of the LHC Beam Transfer Line TI 8
por: Arduini, Gianluigi, et al.
Publicado: (2005) -
Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
por: Uythoven, J, et al.
Publicado: (2008) -
Beam based Alignment of the LHC Transfer Line Collimators
por: Kain, Verena, et al.
Publicado: (2005) -
Aperture Studies of the SPS to LHC Transfer Lines
por: Goddard, Brennan, et al.
Publicado: (2005)