Cargando…
Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC
For the identification of muons behind the Big European Bubble Chamber (BEBC) a detector wall of 6 m × 25 m is required. We describe the construction of the wire chambers, the electronics and the performance of the first chambers. The 50 modular 3 m × 1 m chambers contain 75 000 wires and 10 000 cat...
Autores principales: | , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/0029-554X(76)90368-2 http://cds.cern.ch/record/873978 |
_version_ | 1780907758627848192 |
---|---|
author | Brand, C Brown, R C A Chesi, Enrico Guido Föth, H Gilgrass, A Hilke, H J Jacobs, D Lazeyras, Pierre Sacquin, Yu |
author_facet | Brand, C Brown, R C A Chesi, Enrico Guido Föth, H Gilgrass, A Hilke, H J Jacobs, D Lazeyras, Pierre Sacquin, Yu |
author_sort | Brand, C |
collection | CERN |
description | For the identification of muons behind the Big European Bubble Chamber (BEBC) a detector wall of 6 m × 25 m is required. We describe the construction of the wire chambers, the electronics and the performance of the first chambers. The 50 modular 3 m × 1 m chambers contain 75 000 wires and 10 000 cathode strips, grouped into 20 000 electronic channels to give a variable space resolution. Geometrical acceptance is maximized by the suppression of support lines and spacers. The electronics can buffer up to 1023 events without dead time losses and without limitation on the number of hits per event. Ar/CO 2 mixtures have given good results. |
id | cern-873978 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1976 |
record_format | invenio |
spelling | cern-8739782023-01-25T10:46:18Zdoi:10.1016/0029-554X(76)90368-2http://cds.cern.ch/record/873978engBrand, CBrown, R C AChesi, Enrico GuidoFöth, HGilgrass, AHilke, H JJacobs, DLazeyras, PierreSacquin, YuDevelopment of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBCNuclear PhysicsDetectors and Experimental TechniquesFor the identification of muons behind the Big European Bubble Chamber (BEBC) a detector wall of 6 m × 25 m is required. We describe the construction of the wire chambers, the electronics and the performance of the first chambers. The 50 modular 3 m × 1 m chambers contain 75 000 wires and 10 000 cathode strips, grouped into 20 000 electronic channels to give a variable space resolution. Geometrical acceptance is maximized by the suppression of support lines and spacers. The electronics can buffer up to 1023 events without dead time losses and without limitation on the number of hits per event. Ar/CO 2 mixtures have given good results.CERN-EF-BEAM-76-2oai:cds.cern.ch:8739781976-04-14 |
spellingShingle | Nuclear Physics Detectors and Experimental Techniques Brand, C Brown, R C A Chesi, Enrico Guido Föth, H Gilgrass, A Hilke, H J Jacobs, D Lazeyras, Pierre Sacquin, Yu Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC |
title | Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC |
title_full | Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC |
title_fullStr | Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC |
title_full_unstemmed | Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC |
title_short | Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC |
title_sort | development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the emi for bebc |
topic | Nuclear Physics Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1016/0029-554X(76)90368-2 http://cds.cern.ch/record/873978 |
work_keys_str_mv | AT brandc developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT brownrca developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT chesienricoguido developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT fothh developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT gilgrassa developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT hilkehj developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT jacobsd developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT lazeyraspierre developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc AT sacquinyu developmentofa150m2proportionalchambersystemwitha1millionbitbuffertheemiforbebc |