Cargando…
Development of a 150 m$^{2}$ proportional chamber system with a 1 million bit buffer: the EMI for BEBC
For the identification of muons behind the Big European Bubble Chamber (BEBC) a detector wall of 6 m × 25 m is required. We describe the construction of the wire chambers, the electronics and the performance of the first chambers. The 50 modular 3 m × 1 m chambers contain 75 000 wires and 10 000 cat...
Autores principales: | Brand, C, Brown, R C A, Chesi, Enrico Guido, Föth, H, Gilgrass, A, Hilke, H J, Jacobs, D, Lazeyras, Pierre, Sacquin, Yu |
---|---|
Lenguaje: | eng |
Publicado: |
1976
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/0029-554X(76)90368-2 http://cds.cern.ch/record/873978 |
Ejemplares similares
-
On-line data handling for a 150m2 multiwire proportional chamber array The EMI for BEBC
por: Chesi, Enrico Guido, et al.
Publicado: (1977) -
The external muon identifiers (EMI) at CERN
por: Brand, C, et al.
Publicado: (1978) -
Performance of the external muon identifier for the Big European Bubble Chamber
por: Beuselinck, R, et al.
Publicado: (1978) -
Installation of External Muon Identifier (EMI) chambers behind BEBC
por: CERN PhotoLab
Publicado: (1979) -
The external muon identifier (EMI) for BEBC
Publicado: (1977)