Cargando…
The new dc power supply system for the main ring magnets of the 28 GeV CERN proton synchrotron
High overload capacity, low residual ripple, exact reproducibility of periodic current pulses and very great reliability in long-term duty are essential requirements for a modern power supply system for feeding beam-guide magnets. These requirements can be met with certainty and at reasonable cost b...
Autores principales: | Jahn, K, Rieger, E, Steckmann, E |
---|---|
Lenguaje: | eng |
Publicado: |
1972
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/875793 |
Ejemplares similares
-
Proton synchrotron of 28 GeV
por: CERN. Public Information Office
Publicado: (1970) -
The magnet power supply for a 300 GeV Proton Synchrotron
por: Grütter, F
Publicado: (1963) -
The magnet power supply for a 300 GeV proton synchrotron
por: Grütter, F
Publicado: (1963) -
Magnets and power supply system of JHF 50 GeV main ring
por: Muto, M, et al.
Publicado: (1998) -
Orbit control and ABS trial at KEK 12 GeV proton synchrotron main ring
por: Nakagawa, H, et al.
Publicado: (1999)