Cargando…
900 ms Cycling of the PSB CO2 and CO4 RF Systems
In view of increasing the PSB cycling rate, the C02 and C04 RF systems have been tested with high intensity beam and 900 ms repetition rate. Although the acceleration could be achieved without problems, the test highlighted some weaknesses on the C04 RF system whose solution implies in-depth changes...
Autores principales: | Haase, M, Paoluzzi, M |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/877814 |
Ejemplares similares
-
Investigation about the Feasibility of Cycling the PSB Cavities at 600ms Repetition Time
por: Haase, M, et al.
Publicado: (2003) -
14 May 1997, PSB RF MD Report; h = 1 + 2 with Protons
por: Bento, J, et al.
Publicado: (1997) -
The second harmonic RF system for LHC beam tests in the PSB
por: Baillod, JM, et al.
Publicado: (1994) -
High loss mode behaviour of PSB C04 RF cavities
por: Paoluzzi, M
Publicado: (2000) -
High loss mode behaviour of PSB C04 RF cavities
por: Paoluzzi, M
Publicado: (2000)