Cargando…

The European 400 GeV proton synchrotron

On 19th February 1971, CERN decided to build a super proton synchrotron at a cost of 1150*10/sup 6/ Swiss francs. The design target of 400 GeV with a beam intensity of 10/sup 13/ protons/pulse was reached on the 4th of November 1976 within the original budget, allowing for inflation. The technical a...

Descripción completa

Detalles Bibliográficos
Autores principales: Middelkoop, Willem Cornelis, de Raad, Bastiaan
Lenguaje:dut
Publicado: 1977
Materias:
Acceso en línea:http://cds.cern.ch/record/878639
Descripción
Sumario:On 19th February 1971, CERN decided to build a super proton synchrotron at a cost of 1150*10/sup 6/ Swiss francs. The design target of 400 GeV with a beam intensity of 10/sup 13/ protons/pulse was reached on the 4th of November 1976 within the original budget, allowing for inflation. The technical aspects of the SPS are reviewed, together with operating experience since May 1976. (2 refs).