Cargando…
The superconducting bending magnets 'CESAR'
In 1975, CERN decided to build two high precision superconducting dipoles for a beam line in the SPS north experimental area. The aim was to determine whether superconducting magnets of the required accuracy and reliability can be built and what their economies and performances in operation will be....
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
1978
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/879063 |