Cargando…
The 800 MeV measurement line of the CERN PS booster
The CERN 800 MeV PS Booster (PSB) has been in its running-in stage since May 1972. It consists of 4 superposed synchrotrons which are filled in multiturn injection by double pulsing the present CPS injector, a 50 MeV linac. After R.F.-trapping 20 bunches of protons (5 per ring) are accelerated in ab...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
1973
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TNS.1973.4327209 http://cds.cern.ch/record/880673 |
Sumario: | The CERN 800 MeV PS Booster (PSB) has been in its running-in stage since May 1972. It consists of 4 superposed synchrotrons which are filled in multiturn injection by double pulsing the present CPS injector, a 50 MeV linac. After R.F.-trapping 20 bunches of protons (5 per ring) are accelerated in about 0.6 s to 800 MeV. The 4 beams are then sequentially fast ejected and vertically recombined for transfer to the 28 GeV PS. The dump line was promoted to a measurement line with the threefold purpose of emittance measurement, spectrometry, and transport of the beams to a dump. (10 refs). |
---|