Cargando…

The 800 MeV measurement line of the CERN PS booster

The CERN 800 MeV PS Booster (PSB) has been in its running-in stage since May 1972. It consists of 4 superposed synchrotrons which are filled in multiturn injection by double pulsing the present CPS injector, a 50 MeV linac. After R.F.-trapping 20 bunches of protons (5 per ring) are accelerated in ab...

Descripción completa

Detalles Bibliográficos
Autores principales: Baribaud, Guy, Metzger, C
Lenguaje:eng
Publicado: 1973
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TNS.1973.4327209
http://cds.cern.ch/record/880673
_version_ 1780908169998893056
author Baribaud, Guy
Metzger, C
author_facet Baribaud, Guy
Metzger, C
author_sort Baribaud, Guy
collection CERN
description The CERN 800 MeV PS Booster (PSB) has been in its running-in stage since May 1972. It consists of 4 superposed synchrotrons which are filled in multiturn injection by double pulsing the present CPS injector, a 50 MeV linac. After R.F.-trapping 20 bunches of protons (5 per ring) are accelerated in about 0.6 s to 800 MeV. The 4 beams are then sequentially fast ejected and vertically recombined for transfer to the 28 GeV PS. The dump line was promoted to a measurement line with the threefold purpose of emittance measurement, spectrometry, and transport of the beams to a dump. (10 refs).
id cern-880673
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1973
record_format invenio
spelling cern-8806732021-11-11T09:55:13Zdoi:10.1109/TNS.1973.4327209http://cds.cern.ch/record/880673engBaribaud, GuyMetzger, CThe 800 MeV measurement line of the CERN PS boosterNuclear PhysicsThe CERN 800 MeV PS Booster (PSB) has been in its running-in stage since May 1972. It consists of 4 superposed synchrotrons which are filled in multiturn injection by double pulsing the present CPS injector, a 50 MeV linac. After R.F.-trapping 20 bunches of protons (5 per ring) are accelerated in about 0.6 s to 800 MeV. The 4 beams are then sequentially fast ejected and vertically recombined for transfer to the 28 GeV PS. The dump line was promoted to a measurement line with the threefold purpose of emittance measurement, spectrometry, and transport of the beams to a dump. (10 refs).CERN-MPS-INT-BR-73-2oai:cds.cern.ch:8806731973
spellingShingle Nuclear Physics
Baribaud, Guy
Metzger, C
The 800 MeV measurement line of the CERN PS booster
title The 800 MeV measurement line of the CERN PS booster
title_full The 800 MeV measurement line of the CERN PS booster
title_fullStr The 800 MeV measurement line of the CERN PS booster
title_full_unstemmed The 800 MeV measurement line of the CERN PS booster
title_short The 800 MeV measurement line of the CERN PS booster
title_sort 800 mev measurement line of the cern ps booster
topic Nuclear Physics
url https://dx.doi.org/10.1109/TNS.1973.4327209
http://cds.cern.ch/record/880673
work_keys_str_mv AT baribaudguy the800mevmeasurementlineofthecernpsbooster
AT metzgerc the800mevmeasurementlineofthecernpsbooster
AT baribaudguy 800mevmeasurementlineofthecernpsbooster
AT metzgerc 800mevmeasurementlineofthecernpsbooster