Cargando…
SMTMS: SM18test management system
Prior to their final preparation before installation in the tunnel, the superconducting magnets of the LHC machine will be entirely tested after reception on test benches in a modular test facility called SM18, using dedicated control systems. The testing facility is being operated by teams of highl...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/886385 |
_version_ | 1780908354899542016 |
---|---|
author | Hemelsoet, G H Chohan, V Vadillo, I Veyrunes, E |
author_facet | Hemelsoet, G H Chohan, V Vadillo, I Veyrunes, E |
author_sort | Hemelsoet, G H |
collection | CERN |
description | Prior to their final preparation before installation in the tunnel, the superconducting magnets of the LHC machine will be entirely tested after reception on test benches in a modular test facility called SM18, using dedicated control systems. The testing facility is being operated by teams of highly-skilled and trained operation personnel. This paper describes the tools and management systems developed to help in real time all the teams involved in operation, in order to execute the tests in a defined sequence and to judge the integrity of a magnet. These tools are also being used by the management to track the efficiency of the facility as well as other statistical controls. |
id | cern-886385 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2005 |
record_format | invenio |
spelling | cern-8863852019-09-30T06:29:59Zhttp://cds.cern.ch/record/886385engHemelsoet, G HChohan, VVadillo, IVeyrunes, ESMTMS: SM18test management systemAccelerators and Storage RingsPrior to their final preparation before installation in the tunnel, the superconducting magnets of the LHC machine will be entirely tested after reception on test benches in a modular test facility called SM18, using dedicated control systems. The testing facility is being operated by teams of highly-skilled and trained operation personnel. This paper describes the tools and management systems developed to help in real time all the teams involved in operation, in order to execute the tests in a defined sequence and to judge the integrity of a magnet. These tools are also being used by the management to track the efficiency of the facility as well as other statistical controls.CERN-AB-2005-058oai:cds.cern.ch:8863852005-05-22 |
spellingShingle | Accelerators and Storage Rings Hemelsoet, G H Chohan, V Vadillo, I Veyrunes, E SMTMS: SM18test management system |
title | SMTMS: SM18test management system |
title_full | SMTMS: SM18test management system |
title_fullStr | SMTMS: SM18test management system |
title_full_unstemmed | SMTMS: SM18test management system |
title_short | SMTMS: SM18test management system |
title_sort | smtms: sm18test management system |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/886385 |
work_keys_str_mv | AT hemelsoetgh smtmssm18testmanagementsystem AT chohanv smtmssm18testmanagementsystem AT vadilloi smtmssm18testmanagementsystem AT veyrunese smtmssm18testmanagementsystem |