The instrumentation of the TI8 SPS to LHC transfer line

The new TI8 transfer-line between the SPS and the future LHC was commissioned during two long machine development sessions in autumn 2004. This paper will present the beam instrumentation linked to the extraction region and along the line from the design and installation up to the tests with beam. A...

Descripción completa

Detalles Bibliográficos
Autor principal: Jensen, L
Lenguaje:eng
Publicado: 2005
Materias:
Acceso en línea:http://cds.cern.ch/record/895154
Descripción
Sumario:The new TI8 transfer-line between the SPS and the future LHC was commissioned during two long machine development sessions in autumn 2004. This paper will present the beam instrumentation linked to the extraction region and along the line from the design and installation up to the tests with beam. After minor modifications copies of these systems will be used for the TI2 transfer line to be commissioned with beam in 2007.