Cargando…
The instrumentation of the TI8 SPS to LHC transfer line
The new TI8 transfer-line between the SPS and the future LHC was commissioned during two long machine development sessions in autumn 2004. This paper will present the beam instrumentation linked to the extraction region and along the line from the design and installation up to the tests with beam. A...
Autor principal: | Jensen, L |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/895154 |
Ejemplares similares
-
Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
por: Goddard, B, et al.
Publicado: (2004) -
Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
por: Uythoven, J, et al.
Publicado: (2008) -
Commissioning of the LHC Beam Transfer Line TI 8
por: Uythoven, Jan, et al.
Publicado: (2005) -
Trajectory Correction of the LHC Injection Transfer Lines TI 2 and TI 8
por: Hilaire, A, et al.
Publicado: (1997) -
The Magnet System of the LHC Injection Transfer Lines TI 2 and TI 8
por: Hilaire, A, et al.
Publicado: (1998)