Hardware simulation kit for beam instrumentation
For beam instrumentation front-end software consolidation in the CERN-PS AB-BDI-SW section has launched a campaign in collaboration with the Joint Institute for Nuclear Research (JINR) in Dubna (Russia). This consolidation is to a large extent re-engineering of legacy front-end software of the runni...
Autores principales: | Lokhovitskiy, A, Kortchaguin, D, Ludwig, M |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/895163 |
Ejemplares similares
-
Linac4: Progress on Hardware and Beam Commissioning
por: Lombardi, A M
Publicado: (2015) -
Hardware and Initial Beam Commissioning of the LHC RF Systems
por: Linnecar, T, et al.
Publicado: (2008) -
Bunch by bunch beam instrumentation
por: Lefevre, T, et al.
Publicado: (2010) -
Overview of LINAC4 Beam Instrumentation Software
por: Jensen, L K, et al.
Publicado: (2013) -
rf hardware development work for the CLIC drive beam
por: Carron, G, et al.